涂装电泳线生产节拍提升探讨

彭旺强[1]

现代涂料与涂装 ›› 2022, Vol. 25 ›› Issue (3) : 40-42.

PDF(2863 KB)
PDF(2863 KB)
现代涂料与涂装 ›› 2022, Vol. 25 ›› Issue (3) : 40-42.

涂装电泳线生产节拍提升探讨

  • 彭旺强[1]
作者信息 +

Discussion on the Production Rhythm Promotion of Electrophoresis Coating Line

  • PENG Wang-qiang[1]
Author information +
文章历史 +

摘要

电泳线生产节拍是提升涂装线平衡率的瓶颈。本文介绍了某卡车公司在充分考虑满足质量标准的前提下,从工艺参数调整和设备改造的角度提升电泳生产节拍。

Abstract

The production tempo of electrophoresis line is the bottleneck to improve the balance rate of coating line.In this paper a truck company was introduced how to adjust process parameters and how to renovate equipment for improving electrophoresis production tempo under the demands on fully meeting quality standards.

关键词

电泳;生产节拍;涂装

Key words

electrophoresis;production tempo;coating line

引用本文

导出引用
彭旺强[1]. 涂装电泳线生产节拍提升探讨[J]. 现代涂料与涂装. 2022, 25(3): 40-42
PENG Wang-qiang[1]. Discussion on the Production Rhythm Promotion of Electrophoresis Coating Line[J]. Modern Paint & Finishing. 2022, 25(3): 40-42
中图分类号: TQ639   

PDF(2863 KB)

Accesses

Citation

Detail

段落导航
相关文章

/