The Water System Design of Environmental Protection Painting Line

TANG Ming-hua[1];HE Can-lin[1]

Modern Paint & Finishing ›› 2020, Vol. 23 ›› Issue (10) : 40-43.

PDF(2919 KB)
PDF(2919 KB)
Modern Paint & Finishing ›› 2020, Vol. 23 ›› Issue (10) : 40-43.

The Water System Design of Environmental Protection Painting Line

  • TANG Ming-hua[1];HE Can-lin[1]
Author information +
History +

Abstract

The zero-discharge wastewater system as the main body of water consumption with painting line and a series of water-saving techniques was introduced,including reduction,reuse and recycling.It provides empirical suggestions for environmental protection painting line construction through lean planning,lean design and lean management.

Key words

environmental protection;painting line;reduction;recycling;water system

Cite this article

Download Citations
TANG Ming-hua[1];HE Can-lin[1]. The Water System Design of Environmental Protection Painting Line[J]. Modern Paint & Finishing. 2020, 23(10): 40-43
PDF(2919 KB)

Accesses

Citation

Detail

Sections
Recommended

/