Calculation of JPH and Public Consumption in Painting Workshop

JIANG Shou-jun[1];GAWen-chao[1];ZHANG Ying-jun[1];HAN Ming[1];XING Xiao-wei[1]

Modern Paint & Finishing ›› 2020, Vol. 23 ›› Issue (12) : 63-66.

PDF(2841 KB)
PDF(2841 KB)
Modern Paint & Finishing ›› 2020, Vol. 23 ›› Issue (12) : 63-66.

Calculation of JPH and Public Consumption in Painting Workshop

  • JIANG Shou-jun[1];GAWen-chao[1];ZHANG Ying-jun[1];HAN Ming[1];XING Xiao-wei[1]
Author information +
History +

Abstract

At the stage of planning,under the same production program, the JPH is not same, and under the same JPH, the data of public consumption is quite different.In this paper,through the interpretation of equipment annual base, equipment load, equipment utilization coefficient etc.Through literature、books, and the design experience of public designers,it is clear that how to confirm the JPH and guide the construction design by theoretical calculation of the consumption of compressed air and hot water.

Key words

equipment annual base;JPH;public consumption

Cite this article

Download Citations
JIANG Shou-jun[1];GAWen-chao[1];ZHANG Ying-jun[1];HAN Ming[1];XING Xiao-wei[1]. Calculation of JPH and Public Consumption in Painting Workshop[J]. Modern Paint & Finishing. 2020, 23(12): 63-66
PDF(2841 KB)

Accesses

Citation

Detail

Sections
Recommended

/