Talking about the "Non-stop" Transformation of the Electrophoresis Line in the Coating Workshop of the Automobile Factory

LI Zhi-jie[1];WEI Lin-yun[1];WENG Bo[1];ZHAO Wen-jie[1];ZHENG Yu[1];XIANG Ke[1];DENG Qing-lei[1];WANG Wan-feng[1]

Modern Paint & Finishing ›› 2022, Vol. 25 ›› Issue (11) : 70-72.

PDF(1976 KB)
PDF(1976 KB)
Modern Paint & Finishing ›› 2022, Vol. 25 ›› Issue (11) : 70-72.

Talking about the "Non-stop" Transformation of the Electrophoresis Line in the Coating Workshop of the Automobile Factory

  • LI Zhi-jie[1];WEI Lin-yun[1];WENG Bo[1];ZHAO Wen-jie[1];ZHENG Yu[1];XIANG Ke[1];DENG Qing-lei[1];WANG Wan-feng[1]
Author information +
History +

Abstract

The expansion and transformation of the original line body of the electrophoresis line in the paint shop is a difficult point in construction. The original factory capacity design cycle time is 3 4 JPH, in order to meet the market demand and the cycle time has been increased to 50JPH. It is required that the electrophoretic wire transformation should be completed under the premise of "non-stop" within 4 months from project approval to construction. It was completed under the premise of "pre-process/project management planning, identification of critical paths for transformation, and construction technology innovation to achieve "non-stop" construction of the electrophoresis line, and finally the production improvement without affecting production was realized.

Key words

critical path;electrophoretic solt lengthened;natural gas radiant panel

Cite this article

Download Citations
LI Zhi-jie[1];WEI Lin-yun[1];WENG Bo[1];ZHAO Wen-jie[1];ZHENG Yu[1];XIANG Ke[1];DENG Qing-lei[1];WANG Wan-feng[1]. Talking about the "Non-stop" Transformation of the Electrophoresis Line in the Coating Workshop of the Automobile Factory[J]. Modern Paint & Finishing. 2022, 25(11): 70-72
PDF(1976 KB)

Accesses

Citation

Detail

Sections
Recommended

/