浅谈涂装车间烘干炉设备导入管理思路

胡振东[1]

现代涂料与涂装 ›› 2020, Vol. 23 ›› Issue (10) : 50-53.

PDF(3414 KB)
PDF(3414 KB)
现代涂料与涂装 ›› 2020, Vol. 23 ›› Issue (10) : 50-53.

浅谈涂装车间烘干炉设备导入管理思路

  • 胡振东[1]
作者信息 +

Discussion on Management of Drying Oven in Painting Workshop

  • HU Zhen-dong[1]
Author information +
文章历史 +

摘要

主要介绍了烘干炉设备导入过程中设计和施工安装两个阶段的管理重点设计阶段包含了平面布置图、截面尺寸、土建基础、公用动力和设备结构原理,施工安装阶段包含了施工准备、施工安全和质量管理3个方面。

Abstract

the management emphases were introduced from two aspects such as design and construction during the oven equipment.Fhe design stage included layout plan,section size,civil foundation,utility power and equipment structure principle.The construction and installation stage included three aspects:construction preparation,construction safety and quality management.

关键词

烘干炉;设计;管理思路

Key words

drying oven;design;management

引用本文

导出引用
胡振东[1]. 浅谈涂装车间烘干炉设备导入管理思路[J]. 现代涂料与涂装. 2020, 23(10): 50-53
HU Zhen-dong[1]. Discussion on Management of Drying Oven in Painting Workshop[J]. Modern Paint & Finishing. 2020, 23(10): 50-53
中图分类号: TQ639   