In the case of special cold temperature in northern winter,the decomposition speed of white water becomes relatively slow,and the drying time is slow,which affects the grinding of the paint film.Then more blue and white water is added to shorten the reaction time,which leads to the problem of paint film greening.The preparation method of anti-greening PE transparent primer was introduced,and the various influencing factors were explored.