基于涂装工艺标准工时的管理系统开发

王静雯[1]

现代涂料与涂装 ›› 2023, Vol. 26 ›› Issue (4) : 60-62.

PDF(1848 KB)
PDF(1848 KB)
现代涂料与涂装 ›› 2023, Vol. 26 ›› Issue (4) : 60-62.

基于涂装工艺标准工时的管理系统开发

  • 王静雯[1]
作者信息 +

Development of Management System Based on Standard Working Time Method

  • WANG Jing-wen[1]
Author information +
文章历史 +

摘要

主要介绍了标准工时管理系统开发的关键点,首先在系统里创建涂装车间各生产线的工位,然后配置车型和线速等参数,接下来选择适当的标准工时分析方法,核算标准工时,最后设计多维度报告版式呈现.

Abstract

The key points of standard working time management system were introduced.Firstly,the stations and workplace in each lines were established.Secondly,the data based on long-term production plan was defined.Meanwhile,the proper method was chosen to calculate the working time and input in system.Finally,the reports in diverse templates were exported.

关键词

标准工时管理系统;标准工时;标准工时分析;抽样分析;人员利用率

Key words

standard working time management system;standard working time;MTM analysis;working sampling;workload

引用本文

导出引用
王静雯[1]. 基于涂装工艺标准工时的管理系统开发[J]. 现代涂料与涂装. 2023, 26(4): 60-62
WANG Jing-wen[1]. Development of Management System Based on Standard Working Time Method[J]. Modern Paint & Finishing. 2023, 26(4): 60-62
中图分类号: TQ639   

PDF(1848 KB)

Accesses

Citation

Detail

段落导航
相关文章

/