新工厂投产初期面涂缺陷控制浅析

岳金良[1];孟珊珊[1];李雪洋[1]

现代涂料与涂装 ›› 2023, Vol. 26 ›› Issue (8) : 52-55.

PDF(2944 KB)
PDF(2944 KB)
现代涂料与涂装 ›› 2023, Vol. 26 ›› Issue (8) : 52-55.

新工厂投产初期面涂缺陷控制浅析

  • 岳金良[1];孟珊珊[1];李雪洋[1]
作者信息 +

Analysis of Topcoat Defect Control in Initial Operation of New Factory

  • YUE Jin-liang[1];MENG Shan-shan[1];LI Xue-yang[1]
Author information +
文章历史 +

摘要

主要阐述了在新工厂初期投产过程中,通过对前序缺陷带入、喷漆室大环境、喷漆设备及材料控制等方面分析面涂缺陷并进行对策解决。

Abstract

In the initial commissioning process of the new factory,it explained that the topcoat defects were analyzed through the introduction of pre-defective defects,the environment of the spray booth,spray equipment and material control,and the countermeasures were taken.

关键词

面涂缺陷;前序带入;喷漆室;设备管控;材料;保洁

Key words

topcoat defects;preamble;spray booth;equipment control;material;cleaning

引用本文

导出引用
岳金良[1];孟珊珊[1];李雪洋[1]. 新工厂投产初期面涂缺陷控制浅析[J]. 现代涂料与涂装. 2023, 26(8): 52-55
YUE Jin-liang[1];MENG Shan-shan[1];LI Xue-yang[1]. Analysis of Topcoat Defect Control in Initial Operation of New Factory[J]. Modern Paint & Finishing. 2023, 26(8): 52-55
中图分类号: TQ639   

PDF(2944 KB)

Accesses

Citation

Detail

段落导航
相关文章

/